帝台娇宠鸾帐欢:公主多妩媚,成人性生交大片免费看中文,四虎影视在线影院在线观看,国产又粗又猛又黄又爽无遮挡

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.enke8.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁(yè) > 新聞中心 > 常見問(wèn)題

木工加工棚的使用功能讓人員更

來(lái)源:http://www.enke8.com/   發(fā)布時(shí)間:2022-09-02

加工棚是建筑施工過(guò)程中操作人員或人行的必經(jīng)通道,過(guò)往人員的加工棚為雙層。從懸挑腳手架的懸挑處開始,每隔十米設(shè)置一個(gè)懸挑式加工棚,可以更好地保證加工棚下行走人員的。下面就針對(duì)木工加工棚的使用就來(lái)講講吧。
The processing shed is a necessary passage for operators or pedestrians during the construction process. The processing shed for passing personnel is double-layer. Starting from the cantilevered part of the cantilevered scaffold, a cantilevered processing shed is set every ten meters, which can better ensure the safety of people walking under the processing shed. Let's talk about the use of woodworking shed.
在施工過(guò)程中,在搭建加工棚時(shí)注意防護(hù)措施,施工人員按照施工要求進(jìn)行施工,露天攪拌機(jī)位置、現(xiàn)場(chǎng)混凝土攪拌機(jī)、卷?yè)P(yáng)機(jī)棚、鋼筋棚、木棚、部分出入口和現(xiàn)場(chǎng)廁所需要設(shè)置木工加工棚。
During the construction process, pay attention to protective measures when setting up the processing shed. The construction personnel shall carry out construction according to the construction requirements. Woodworking processing shed shall be set at the location of the open-air mixer, the site concrete mixer, the hoist shed, the steel bar shed, the wood shed, some entrances and exits and the site toilet.
水平保護(hù)安裝和拆除前,進(jìn)行技術(shù)交底。高空作業(yè)人員經(jīng)過(guò)技術(shù)培訓(xùn)和考試,并持證上崗。加工棚使用的鋼管、扣件等材料符合JGJ130-2011《建筑施工扣件式鋼管腳手架技術(shù)規(guī)范》及相關(guān)標(biāo)準(zhǔn)的要求。
Safety technical disclosure shall be conducted before installation and removal of horizontal protection. Operators working at heights shall receive professional technical training and professional examination and take up their posts with certificates. The steel pipes, fasteners and other materials used in the processing shed meet the requirements of jgj130-2011 technical code for safety of steel tubular scaffold with fasteners in building construction and relevant standards.
安裝和拆除水平加工棚時(shí),操作人員的“三寶”齊全并正確使用。加工棚搭設(shè)和拆除時(shí),應(yīng)避免上下同時(shí)作業(yè),錯(cuò)開作業(yè)時(shí)間。安裝和拆除加工棚時(shí),所有材料和工具應(yīng)堆放在建筑物外緣少2m處,堆放高度不得超過(guò)1m。
When installing and removing the horizontal processing shed, the "three safety treasures" of the operators shall be complete and correctly used. During the erection and dismantling of the processing shed, it shall be avoided to operate up and down at the same time and stagger the operation time. When installing and removing the processing shed, all materials and tools shall be stacked at least 2m away from the outer edge of the building, and the stacking height shall not exceed 1m.
木工加工棚
建造和拆除加工棚時(shí),應(yīng)在地面上設(shè)置警戒區(qū),并派專人監(jiān)控。建造和拆除加工棚時(shí),應(yīng)指定專人指揮。管理人員應(yīng)注意眼、腿、口,采取有效的防護(hù)措施應(yīng)對(duì)危險(xiǎn)情況,確保人員。
During the construction and demolition of the processing shed, a warning area shall be set on the ground and a special person shall be assigned to monitor it. When constructing and dismantling the processing shed, a special person shall be appointed to command. The management personnel shall pay attention to the eyes, legs and mouth, take effective safety protection measures to deal with dangerous situations and ensure personnel safety.
在雨天和大風(fēng)天氣,應(yīng)暫停加工棚的搭設(shè)和拆除,并檢查和維護(hù)加工棚的質(zhì)量。加工棚搭設(shè)完成后,經(jīng)專職員驗(yàn)收合格后方可投入使用。在搭設(shè)和拆除水平防護(hù)前,進(jìn)行技術(shù)交底。
In rainy and windy weather, the erection and removal of processing shed shall be suspended, and the quality of processing shed shall be inspected and maintained. After the erection of the processing shed is completed, it can only be put into use after being accepted by the full-time safety officer. Before setting up and removing horizontal protection, safety technical disclosure shall be conducted.
從中我們了解到在安裝加工棚的時(shí)候一定注意施工,施工人員按照施工要求進(jìn)行施工,同時(shí)還要保證搭建質(zhì)量,這樣才能實(shí)現(xiàn)保護(hù)的作用,這樣才能達(dá)到我們搭建的目的。更多相關(guān)內(nèi)容就來(lái)我們網(wǎng)站http://www.enke8.com咨詢了解吧。
From this, we learned that when installing the processing shed, we must pay attention to construction safety. The construction personnel must carry out construction according to the construction requirements, and at the same time, we must ensure the construction quality. Only in this way can we achieve the protection function and achieve our goal of building. For more information, please visit our website http://www.enke8.com Consult and understand.

亚洲AV无码一区二区三区网站| 男男黄GAY片免费网站WWW| 久久久久国产精品| 美国ZOOM动物| 国模欢欢炮交啪啪150P| 30岁少妇一摸就出水| 无码精品A∨在线观看中文| 边摸边脱吃奶边高潮视频免费| 国产亚洲精品久久久久婷婷图片| 丰满少妇作爱视频免费观看| 丽娟两腿间一大丛黑毛| 无码人妻AⅤ一区二区三区| 国产精品女A片爽爽波多洁衣| 亚洲VA天堂VA欧美ⅤA在线| 香港三日本8A三级少妇三级99| 娇妻被领导粗又大又硬| 国产精品无码专区AV在线播放| 国产亚洲精品久久久久久久久动漫| 伊人久久大香线蕉AV一区二区| 亚洲AV无码乱码在线观看| 女の乳搾りです在线观看| 黑人双人RAPPER| 女人被狂躁G点高潮喷水| 成熟女人毛片WWW免费版在线| 国产一区二区在线观看| 暴力肉体进入HDXXXX| 97亚洲成a人无码亚洲成a无码| 藏精阁AV无码亚洲AV| 免费无遮挡无码永久在线观看视频| 精品亚洲AV乱码一区二区三区| 国产AⅤ激情无码久久久无码| 男人的天堂AV| 出差被夫の上司持久侵犯三浦步美| 92久久偷偷做嫩草影院免费看| 性夜夜春夜夜爽AA片A| 少年汁水四溅捣出白沫H| 被H系统改造成校花被H| 亚洲AV日韩AV无码污污网站| 成人国产片女人爽到高潮网站| 女厕偷窥一区二区三区| 最近免费中文字幕大全高清MV|