工地鋼筋加工棚搭建要注意什么?

來源:http://www.enke8.com/   發(fā)布時間:2022-01-11

1、工地鋼筋加工棚搭設(shè)規(guī)范:

1. Specification for erection of reinforcement processing shed on site:
鋼筋加工棚是施工現(xiàn)場內(nèi)對鋼筋進(jìn)行拉直、彎曲、焊接等鋼筋加工作業(yè)的一個場地。鋼筋加工棚的長和寬,一般會根據(jù)鋼筋加工數(shù)量和使用機械的多少確定加工棚的大小,一般情況有6*12m、9*12m、18*30m等幾種,可以根據(jù)施工實際情況,自行設(shè)計長與寬尺寸。鋼筋加工棚工作臺的布置也要合理,根據(jù)真實鋼筋加工流程來,還有加工前原材料鋼筋和加工結(jié)束后成品的存放,所以鋼筋加工棚的地面應(yīng)高于施工場地地面30cm,防止雨水浸泡,用腳手管進(jìn)行搭設(shè)時,應(yīng)有地橫桿和斜撐,以保證加工棚的穩(wěn)定性。
The reinforcement processing shed is a site for straightening, bending, welding and other reinforcement processing operations on the construction site. The length and width of the reinforcement processing shed are generally determined according to the number of reinforcement processing and the number of machines used. Generally, there are 6 * 12M, 9 * 12M, 18 * 30m and so on. The length and width can be designed according to the actual construction situation. The layout of the worktable of the reinforcement processing shed shall also be reasonable. According to the real reinforcement processing process, as well as the storage of raw materials and finished products before processing, the ground of the reinforcement processing shed shall be 30cm higher than the ground of the construction site to prevent rainwater immersion. When erecting with scaffold pipes, there shall be ground cross bars and diagonal braces to ensure the stability of the processing shed.
2、工地鋼筋加工棚搭建細(xì)節(jié):
2. Construction details of reinforcement processing shed on site:
埃歐哲鋼筋加工棚采用國際標(biāo)準(zhǔn)鋼材制作,在現(xiàn)場利用扣件將多根鋼管扣接搭設(shè)成加工棚的整體式鋼結(jié)構(gòu),再設(shè)置斜撐和雙層防砸結(jié)構(gòu),校驗鋼結(jié)構(gòu)強度是否符合設(shè)計要求,在欄桿上鉤掛標(biāo)語橫幅,整個鋼筋加工棚施工完畢標(biāo)準(zhǔn)化設(shè)計。全拼裝式,快速組裝,拆卸簡單,方便運輸,型材及配件規(guī)格可按需求來定制。同時地面也需要硬化,立柱基礎(chǔ)澆筑700*700*700mm混凝土,預(yù)埋300*300*12mm鋼板。
The eozhe reinforcement processing shed is made of international standard steel. Firstly, multiple steel pipes are buckled and erected on site to form an integral steel structure of the processing shed, and then diagonal bracing and double-layer anti smashing structure are set to verify whether the strength of the steel structure meets the design requirements. Safety slogans and banners are hung on the railings. The construction of the whole reinforcement processing shed is completed and standardized. Full assembly, quick assembly, simple disassembly and convenient transportation. The specifications of profiles and accessories can be customized according to demand. At the same time, the ground also needs to be hardened. The column foundation is poured with 700 * 700 * 700mm concrete and embedded with 300 * 300 * 12mm steel plate.
木工加工棚
3、工地鋼筋加工棚需注意事項:
3. Precautions for site reinforcement processing shed:
1.一般情況下,鋼筋加工棚都在塔吊的吊運范圍內(nèi),否則鋼筋吊動不方便,同時必須設(shè)置雙層硬質(zhì)防護(hù),棚的具體尺寸要根據(jù)實際情況來定。
1. Generally, the reinforcement processing shed is within the lifting range of the tower crane, otherwise it is inconvenient to lift the reinforcement. At the same time, double-layer hard protection must be set, and the specific size of the shed shall be determined according to the actual situation.
2.防護(hù)棚的頂有二層的,上面的隔層上鋪模板,下面一層鋪二層竹芭片子,二層之間間距500 mm。
2. If there are two layers on the top of the protective shed, the upper compartment is paved with formwork, and the lower layer is paved with two layers of bamboo sheets, with a spacing of 500 mm between the two layers.
3.工具式鋼筋加工棚需在醒目處掛操作規(guī)程圖牌和宣傳用語的橫幅,圖牌的尺寸為:寬×高=2000mm×1000mm,橫幅寬度宜為1m。
3. The tool type reinforcement processing shed shall hang the operation specification drawing board and the banner of safety publicity language at an eye-catching place. The size of the drawing board is: width × Height = 2000mm × 1000mm, and the banner width should be 1m.
4.加工車間地面需硬化,宜選用砼地面。
4. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
5.內(nèi)部有滅火器、鋼筋加工設(shè)備、有照明系統(tǒng)
5. There are fire extinguishers, reinforcement processing equipment and lighting system inside
6.加工車間地面需硬化,宜選用砼地面。
6. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
7. 南方地區(qū),如遇臺風(fēng)應(yīng)采取防風(fēng)措施,可設(shè)置纜風(fēng)繩。
7. In case of typhoon in southern China, windproof measures shall be taken, and wind ropes can be set.
感謝您的閱讀,此文的文章來源:木工加工棚更多的內(nèi)容和問題請點擊:http://www.enke8.com我們會繼續(xù)努力的為您提供服務(wù),感謝您的支持!
Thank you for reading. The source of this article is woodworking shed. For more information and questions, please click: http://www.enke8.com We will continue to work hard to provide you with services. Thank you for your support!

精品国产精品国产偷麻豆| 性做久久久久久久久| 中文在线А天堂中文在线新版| 久久夜色精品国产欧美乱| 国产综合久久久久久鬼色| 农场主的女儿们 经典K 8| 我高潮太爽忍不住大叫怎么办| 亚洲狠狠婷婷综合久久久久图片| 久久国产精品-国产精品| 清纯校花粉嫩粗大进出好爽| 东京热AV人妻无码专区| 午夜精品久久久久久久久| 他用嘴巴含着我奶头吸怎么办| 被带到调教室刑床惩罚挠痒痒作文| 精品无码人妻一区二区三区品| 日本无码视频| 国产AV亚洲精品久久久久| 日本免费无码一区二区到五区| 色一情一乱一伦一区二区三区日本| GAY18无套润滑剂男男| 色一情一乱一伦| 蜜臀久久久久久999草草| 色婷婷7777免费视频在线观看| 亚洲AV无码乱码国产精品FC2| 亚洲av无码乱码在线观看性色| 高潮A片WWW张柏芝陈冠希| 国产精品一线二线三线有什么区别| 人与禽120分钟性视频| 老汉扛起娇妻玉腿进入| 精品无码AV一区二区三区不卡| 亚洲AV无码久久寂寞少妇| 无码任你躁久久久久久老妇| 亚洲熟女一区二区三区| 青楼妓女禁脔道具调教SM| 无人在线观看高清完整免费| YIN荡的人妻美妇系列| 日本熟妇色XXXXX日本免费看| 被C哭着爬走又被拉回来挺进H| 被陌生人带去卫生间啪到腿软| 日本强好片久久久久久AAA| 国产专区一线二线三线品牌|